Initial Production Facilities, Iraq
Supply of experienced staff to both lead the civils team and to provide engineering expertise on this project designed in the client’s offices in Dubai.
A QuadConsult Director and a civil/structural team were based overseas for thirteen months achieving all the design targets and supervising soils investigations and topographic surveys on site in Iraq.
The project consists of three sites each separated by some 15km where facilities are being constructed to regenerate the area’s natural resources. Minimisation of construction time was the key to a successful outcome coupled with the need to design and issue foundation information in advance of details of the equipment being available.
Deep excavations requiring extensive de-watering and temporary works were involved in order to achieve significant schedule benefits to the procurement process.
A structural engineer from QuadConsult continued with the project based in Dubai thereby gaining valuable experience and assisting with the progress towards the achievement of chartered engineer status.
Other Industrial Sector Projects
Bolton Hill Quarry, Haverfordwest, West Wales, UK
Analysis and assessment of re-purposing of crushing plant.
Felinfach Industrial Estate, South Wales, UK
Construction of 11 commercial/industrial units totalling 70,000 sq ft varying in size from 2,500 sq ft to 20,000 sq ft.
Initial Production Facilities, Iraq
Supply of experienced staff to both lead the civils team and to provide engineering expertise on this project designed in the client’s offices in Dubai.
Battersea Gas Works, London, UK
Investigation of consequences of de-watering gas holder pits.