Rothienorman, Battery Energy Storage System (BESS)
We’re pleased to see the completion of another Battery Energy Storage System project for which QuadConsult provided the civil and structural engineering design.

Our scope covered a broad range of infrastructure required to deliver the facility, including:
▪️ Earthworks and site formation
▪️ Site drainage
▪️ Access and internal track design
▪️ Equipment and BESS foundations
▪️ Secondary structural elements
▪️ Civil and structural detailing
Projects such as this require close coordination between the civil, structural and electrical elements, with particular consideration given to ground conditions, levels, drainage, construction access and the numerous equipment interfaces across the site.
The photographs give a great overview of the completed installation and the extent of the infrastructure required to support the BESS equipment.
Other Infrastructure & Transportation Projects
Rothienorman, Battery Energy Storage System (BESS)
We’re pleased to see the completion of another Battery Energy Storage System project for which QuadConsult provided the civil and structural engineering design.
Forest Walk Roundabout, Lydney, Gloucestershire
Roundabout for large residential development in Lydney, Gloucestershire
Troed-yr-Aur Farm, West Wales, UK
1.8m gallons of slurry storage including bulk earthworks to achieve a cut and fill balance, and access tracks.
Bwlch Nant yr Arian Visitor Centre, Mid Wales, UK
A drainage feasibility study for a Forestry Commission visitor centre near Aberystwyth, Mid Wales.
Bevan’s Lane Bridge, Cwmbran, South Wales, UK
Sensitive development of fourteen metre span highway bridge over existing heritage canal.