Allt-yr-yn, Newport, South Wales, UK

Allt_Yr_Yn_Street_View_2

QuadConsult Limited was engaged to support the development through the construction stage and secure the Section 38 and Section 104 agreements with the Local Authority and DCWW respectively. The site topography is very challenging and QuadConsult Limited staff have engineered levels on the site to achieve a near cut and fill balance.